Dufago concrete completed pouring console beams and other items at the M-Garden city project in Danang.
Beams are one of the most difficult and backbone parts of the project. November 10, 2021 Dufago completed this category. With the largest transfer girder size 2650m x 2500m with 3 console beams 8.75m long. This important floor transfer beam system has a floor area of 810m2 with many very complex structural details, the total volume of concrete used is 730m3.
Take a look at Dufago's photos at M Garden City Danang below - is one of the projects evaluated by Archdaily with large scale and unique architecture in the world.